Camera Module Customization Solution

← Back to Applications

For surveillance IPC, video door entry, in-vehicle and special imaging scenarios, Hongyin Tech provides camera module customization: sensor & lens selection, ISP image tuning, and module-to-board integration. Platforms cover RV1126/RV1106 low-power IPC, RK3588 multi-camera AI and HiSilicon Hi3516/Hi3519 series, with starlight and wide-dynamic imaging options. Free requirement review with a recommended sensor list.

Pain Points

Recommended Hardware Configuration

Platform optionsRV1126 / RV1106 (low-power IPC), RK3588 (multi-camera + AI), HiSilicon Hi3516 / Hi3519
Sensor selectionRecommended per scenario: starlight low-light, wide dynamic, large optical format, global shutter
LensFixed/zoom, various FoV and mounts (M12 etc.), jointly validated with sensor
Interface & formMIPI CSI / USB / Ethernet; bullet, dome or bare-board module forms
Illumination & mechanicsIR/white-light illumination, waterproof mechanics per enclosure requirements

Software Capabilities

Deliverables & Services

FAQ

Q:Can you provide evaluation samples?

Yes. Projects typically start with an imaging requirement review, followed by module samples for your own low-light and WDR testing; an imaging evaluation report accompanies the samples.

Q:Which sensors are supported? Can we specify the model?

Mainstream starlight, wide-dynamic and global-shutter sensor series are supported. We can adapt to your specified model, or recommend field-proven sensor-lens combos by scenario and cost.

Q:How is low-light performance guaranteed?

It starts with sensor selection (starlight, large optical format), then ISP denoising and gain strategy tuning, and is finally accepted by real low-light samples. Recommended configurations per illumination target are given in the requirement review.

Q:Our module volume is small — can you still do it?

Low-volume ordering is supported. For early-stage projects, we can also start from an existing module variant to control upfront investment, moving to full customization once requirements settle.

Related Technical Articles

Need an evaluation for this scenario?
Share your scenario and requirements — free requirement review, selection advice within 48 hours.
Get a Free Quote →